
Industrial buildings
Elzinga hall heating: lead time from 3 to 2 days
100 kW gasto18 kW electric
Targeted infrared heating in four halls. Just 18 kW electric proves sufficient and production is faster.
View the case studyIndustrial buildings
Rentex BV
Infrared radiation and air heating replace an outdated gas heating system.

Rentex BV heated its industrial hall with gas-fired air heating that was technically outdated and no longer worked properly.
Heat remained at height and was distributed unevenly. Workplaces were too cold and employee comfort was inadequate. In a high hall, air heating must first warm large volumes of air before anything is felt at working height.
We combined targeted electric infrared heating with efficient air heating. Heat is distributed more evenly throughout the hall and delivered directly to workplaces.
Workplaces are comfortably heated, heat is distributed more evenly and Rentex has greater control over the indoor climate. The outdated gas heating has been replaced.
Services

Industrial buildings
100 kW gasto18 kW electric
Targeted infrared heating in four halls. Just 18 kW electric proves sufficient and production is faster.
View the case study
Industrial buildings
32 kW gasto9.3 kW electric
A 2,500 m³ production hall heated efficiently with SHS IR Heaters.
View the case study
Industrial buildings
67 kW gasto9.3 kW electric
Targeted electric heating for the workshop and showroom, controlled via smartphone.
View the case studyBook a consultation about your hall and the zones you use.
Would this suit your situation? Let us discuss it.